Call Now — Free Estimate: 📞 (877) 349-1553 24/7
EMERGENCY STORM REPAIR info@davisroofingandmaintenance.com
(877) 349-1553
Home Services All Services Roof Replacement Roof Repair Storm Damage Repair New Roof Installation Metal Roofing Shingle Roofing Flat Roofing Commercial Roofing Gutter Installation Roof Inspection Emergency Roof Repair Skylight Installation About Locations All Locations Slater, SC Warrenville, SC Bethune, SC Clemson, SC Ehrhardt, SC Greenville, SC Kershaw, SC Mauldin, SC Olar, SC Reviews Contact (877) 349-1553
★★★★★ 4.7 Stars · 213+ Reviews

Starr New Roof Installer | Licensed & Certified

Same-Day Appointments Available  ·  24/7 Emergency Service

12+ Years Protecting Starr Homes — Starr Roofing & Maintenance. Manufacturer-Backed Warranties.

Call (877) 349-1553
📞 (877) 349-1553

Storm damage? We deploy tarps and temporary repairs within hours.

Same-Day Service Licensed & Insured Free Estimates
<60 Min
Response Time
12+
Years Experience
4.7
Star Rating
213+
Happy Reviews

Building a new home or adding on to your existing one? Starr Roofing & Maintenance handles new roof installation from decking to ridge cap. We work with your general contractor or architect to coordinate scheduling, material selection, and code compliance for your Starr build.

Our New Roof Installation Process

1

Design Consultation

We analyze your plans for pitch, square footage, ventilation needs, and code compliance. You get a detailed proposal with material specs, timeline, and fixed pricing before any work begins.

2

Pre-Installation Setup

We coordinate delivery timing with your GC so materials don't sit exposed longer than necessary. Our staging crew organizes everything on the roof deck for efficient installation the next morning.

3

Certified Installation

Our Starr crew installs every layer to manufacturer specifications: underlayment, ice and water shield, drip edge, starter strip, field material, hip and ridge caps, and ventilation. Every fastener placed per the manufacturer nailing schedule.

4

Warranty Registration

After installation: quality inspection, building department sign-off, manufacturer warranty registration, and cleanup. Your new roof is warranted from the day it passes inspection.

What Starr Customers Say

★★★★★ 4.7/5 from 213+ reviews
★★★★★

"From the first phone call to the final walkthrough, everything was seamless. The team was courteous and efficient. Already recommended them to two friends."

M
Mark J., Starr
★★★★★

"Our neighbors recommended them and now we understand why. Meticulous attention to detail and they treated our home like it was their own."

J
Jessica A., Starr
★★★★★

"Best experience we've ever had with a home service company. On time, on budget, and the results exceeded what we expected. Truly top-notch."

M
Michael G., Starr
Join 213+ Happy Customers — Call (877) 349-1553

Why Choose Starr Roofing & Maintenance for New Roof Installation?

Ventilation Design

We calculate intake and exhaust per IRC R806 for every new install. Balanced ventilation extends roof life and cuts energy costs. Most contractors skip this step.

Material Selection Guidance

Shingles, metal, flat systems. We install all of them and help you choose based on your budget, design, and the demands of SC climate.

Full Manufacturer Warranty

Factory-certified installation means your new roof warranty is fully backed from day one. No gaps, no exclusions from improper installation.

Builder Coordination

We work directly with your GC on scheduling, staging, and inspections. On-time delivery and clean work that doesn't slow down the rest of the build.

New Roof Installation FAQ

Absolutely. We tie new roofing into existing roof structures with proper flashing and waterproofing at the transition. Matching the existing shingle color and profile is standard practice.

Critical. Improper ventilation causes premature shingle aging, ice dams in cold weather, and excessive attic heat in summer. We calculate intake and exhaust per code requirements. Balanced ventilation extends roof life and reduces energy costs.

Synthetic underlayment meeting ASTM D6757 across the full deck. Ice and water shield per ASTM D1970 at eaves, valleys, and all penetrations. These layers are critical. They're your last line of defense if the shingles fail.

Have More Questions? Call (877) 349-1553

SAME-DAY APPOINTMENTS AVAILABLE

Starr's Most Trusted Roofer — One Call Away.

24/7 emergency service. Most appointments available within 48 hours.

Call Now — Free Estimate
📞 (877) 349-1553

★★★★★ 4.7/5 from 213+ Reviews  ·  Licensed  ·  Insured

About Our Starr New Roof Installation Services

Whether it's GAF Timberline HDZ, Owens Corning Duration, CertainTeed Landmark, or a standing seam metal system, our Starr crews install it the way the manufacturer requires. Factory-certified installation means your warranty is fully backed from day one.

Typical new roof installation in Starr takes 1-3 days depending on size and complexity. We coordinate with your builder on scheduling, material delivery, and inspection timing. Materials are staged on-site the day before install to keep the project on schedule.

← All Services New Roof Installation in Slater → New Roof Installation in Warrenville → New Roof Installation in Bethune → New Roof Installation in Clemson → New Roof Installation in Ehrhardt → New Roof Installation in Greenville →
📞